Hello,
i have a Problem with Links and Baseline. When i Link to an Object he always links to the current Baseline, but i dont want that, i want that the Link i set stays with the Baseline i Linked. So when Product A is Linked to B version 1.1 and i change the version to 1.2 the Link stays on Version 1.1
Can anyone help me? Henry12 - Fri Jul 21 03:37:02 EDT 2017 |